Fresh Energy filed initial comments at the Minnesota Public Utilities Commission on October 30, 2026, on Xcel Energy’s first gas Integrated Resource Plan (IRP), in partnership with Minnesota Center for Environmental Advocacy (MCEA) and Sierra Club. To help inform our comments and build the record for the Commission’s review, we worked closely with an expert gas engineer with more than 40 years of experience in gas system modeling and planning, whose technical analysis informed our comments.

Gas IRPs are a new regulatory framework to evaluate how gas utilities are forecasting future gas needs and identifying affordable, reliable, and climate-aligned energy sources. Established in 2024, gas IRPs are a new way that Fresh Energy’s Buildings team is advocating for reliable service, protecting ratepayers from volatile fossil fuel markets, and preparing for a decarbonized economy.

In our joint comments, we analyzed Xcel’s proposed gas infrastructure projects and whether the utility had adequately demonstrated the need for those investments and thoroughly evaluated alternatives. After thorough research and evaluation, we recommended improvements to Xcel’s gas demand forecasts and the assumptions underlying its Expansion Alternatives Analyses (EAAs), additional analyses of proposed gas infrastructure projects, and updates to requirements for Xcel Energy and other gas utilities to use in future gas IRPs. These improvements would help ensure projects are reliable, affordable, and align with state climate targets.

We recommended that Xcel improve its customer growth forecasts by using more localized data. Xcel currently uses a generalized, county-level forecast to plan its proposed capacity projects, which can overlook localized growth patterns and double-count new developments and gas service requests. Using more detailed, sub-county data and comparing past forecasts with actual growth would help ensure that infrastructure investments reflect customer needs.

Fresh Energy and our partners also recommended that Xcel more thoroughly evaluate non-pipeline alternatives such as heat pumps, energy efficiency, and demand response in its EAAs to determine if gas infrastructure investments can be deferred or avoided. Our analysis identified several issues with Xcel’s modeling, including assumptions about heat pump performance and the costs of implementing alternatives that can make non-pipeline alternatives appear less favorable than they are. We suggested correcting these issues, expanding future portfolios to include commercial customers and building envelope improvements, and evaluating EAA portfolio scenarios in future models that evaluate different mixes of demand response, heat pumps, and other non-pipeline alternatives to better determine the tradeoffs between cost and emissions reductions. We advised that Xcel move forward with implementing alternatives to two of the proposed gas infrastructure projects and conduct further evaluation of alternatives for a third.

Finally, we urged the Commission to strengthen gas IRP requirements to better ensure investments are cost-effective, reliable, and aligned with Minnesota’s climate targets. This includes requiring utilities to provide the hydraulic models and supporting data needed to evaluate proposed capacity projects and requiring utilities to consider non-pipeline alternatives when planning gas main and service line replacements.

Xcel Energy’s first gas IRP is a milestone for gas utility planning in Minnesota. These plans are designed to help regulators, stakeholders, and the public understand how utilities expect demand for gas service to change over time, what investments they are considering, and whether those investments are affordable, reliable, and aligned with Minnesota’s climate goals. Fresh Energy appreciates the opportunity to contribute to this process and advocate for greater transparency and accountability in gas utility planning.

We will continue to engage in Xcel Energy’s gas IRP proceeding at the Commission and look forward to engaging in upcoming resource plans from CenterPoint Energy and Minnesota Energy Resources Corporation (MERC).

We are in unprecedented times for climate progress. 

Fresh Energy is fighting harder than ever for the just, prosperous, and resilient clean energy future that all Minnesotans deserve. Donate today and support our unrelenting advocacy.